Rough framing is arguably the most critical stage of construction. Once the frame is up, every other trade—from plumbing and electrical (MEP) to drywall and insulation—relies on its precision. Signing off on rough framing prematurely or without due diligence is one of the quickest ways to create costly punch lists and scheduling delays down the line.
Here are four essential quality control checks every General Contractor (GC) must complete before moving forward with the next phases:
1. Verify Load-Bearing Alignment and Plumb
It sounds basic, but misaligned walls are a constant source of frustration. A wall that is slightly out of plumb (not perfectly vertical) will cause issues for drywall installation (creating waviness), door/window fitting, and tile alignment.
• The Check: Use a laser level, not just a standard bubble level, to confirm that all load-bearing walls are perfectly plumb and that the studs are aligned directly over the bottom plate. Pay special attention to corners and long wall runs, which tend to drift.
• The Cost of Failure: Drywall contractors will have to spend extra time shimming or floating the walls, which they will rightfully charge as an extra or change order.
2. Review All Cutouts and Penetrations
Before MEP trades rough-in their pipes and conduits, ensure the structural framing team has completed all necessary headers, trimmers, and cutouts correctly, especially for HVAC ductwork and large drainage pipes.
• The Check: Cross-reference the structural drawings with the MEP plans. Are all large openings properly boxed out with double studs and lintels? Are there any spots where a beam has been inappropriately notched or drilled?
• The Cost of Failure: A poorly placed hole or notch can compromise structural integrity. Finding this after the drywall is hung means tearing out finished work and facing inspection failure.
3. Confirm Fire and Sound Rating Compliance
In Southern California, particularly in multi-family and commercial builds, strict fire rating (e.g., Type III/V) and sound transmission class (STC) ratings are mandated. This often impacts the specific construction of interior walls (e.g., staggered studs, double layers, specific insulation).
• The Check: Visually confirm the framing contractor used the correct gauge metal studs (if applicable), specified fire-blocking material, and built the rated wall assemblies exactly according to the architectural notes and code requirements.
• The Cost of Failure: An inspector flagging non-compliant fire rating is a critical failure that requires immediate, expensive rework, often involving pulling out insulation and re-framing sections.
4. Finalize Digital Verification (BIM Clash Detection)
If the project used Building Information Modeling (BIM), this is your final opportunity to leverage that investment before the walls disappear.
• The Check: Run a final clash detection report (or have your BIM coordinator do so) between the structural frame and the rough-in routes for HVAC and plumbing. Finding a conflict now—like a main pipe running directly through a load-bearing column—takes five minutes to correct. Finding it when the electrician is on site takes two days and a major argument.
• The Cost of Failure: Field conflicts between trades that should have been caught digitally waste days of specialized labor and can strain relationships with reliable subcontractors.
Actionable Insights Lead to Better Projects
By tightening up these four checkpoints, you secure the integrity of your project and ensure the next phase—like specialized drywall framing and installation—can proceed efficiently and profitably. We know high-quality subcontractors handle these details themselves, but as the GC, the final responsibility is always yours.
Are you a General Contractor in SoCal with a great QC checklist? Share your best tip in the comments below!
Interested in being featured in our Local Leader Spotlight? We’d love to share your story with our network. Reach out on our Contact page.